HP Systems Insight Manager 6.2 Installation and Configuration Guide for Linux

NOTE: The limit of 10 task results applies to scheduled tasks with the "job-log" flag enabled in the
tool definition. Scheduled tasks for the tools with the "job-log" flag disabled have a limit of 1. This value
is not configurable.
By default, the last task results for a scheduled task is kept indefinitely.
Procedure 7-2 Keeping more than one job
1. Stop HP Systems Insight Manager.
2. Edit globalsettings.props and add:
MX_JOB_MIN_COMPLETED_JOBS_PER_TASK=n
Where n, is the number of task result you want to retain.
3. Start the HP Systems Insight Manager service to reflect the changes.
Configuring task results 39