ISS Technology Update, Volume 6 Number 8 - Newsletter

ISS Technolo
g
y Update
Keeping you informed of the latest ISS technology
ISS Technolo
Volume 6, Number 7
g
y Update
Volume 6, Number 8
Keeping you informed of the latest ISS technology
Converting HP BladeSystem c7000 Enclosures between 3-phase and single- phase power.......................1
Implementing power management software in large, remote environments ............................................3
Frequently asked questions regarding the adoption of HP VDI.................................................................6
Cooling the HP BladeSystem c3000 Enclosure ........................................................................................10
How to define custom fields within HP Systems Insight Manager to view system information ................13
ProLiant management tip of the month..................................................................................................18
Recently published industry standard server technology papers ............................................................19
Contact us .............................................................................................................................................19
Converting HP BladeSystem c7000 Enclosures between 3-phase and single-
phase power
HP BladeSystem c7000 Enclosures are available as three different models, each of which is designed to work with a specific
power infrastructure, either single-phase or 3-phase based. Installed enclosures can, however, be successfully converted from
one power infrastructure to another by:
Replacing the Input Power Module, and
Reconfiguring the enclosure’s incoming power distribution.
Successfully converting an enclosure entails three basic steps:
Ensuring the correctness of the new power infrastructure prior to conversion
Replacing the existing Input Power Module with one appropriate to the new power infrastructure
Updating the enclosure’s Onboard Administrator to comply with the new Input Power Module
Ensuring Power Infrastructure
Before beginning a conversion, it is important to first make sure that the correct receptacle(s) and/or PDU infrastructure is
available for the converted enclosure. For more information on powering c-Class enclosures, please consult the HP BladeSystem
Site Planning Guide, available online at
http://h71028.www7.hp.com/enterprise/cache/499697-0-0-0-121.html.

Summary of content (19 pages)