HP Instant Capacity User's Guide for versions B.07.x

Special Considerations
Upgrading to Instant Capacity versions B.06.x or B.07.x Software
Appendix A124
Step 8. If the Exception status in
Step 7 indicates that there are more
processors, cells, or memory active than expected, you need to deactivate
the appropriate number of each component in order to bring the system
into compliance with the Instant Capacity contract.
Step 9. From the output in
Step 7, verify that the correct system-contact
information is specified. If necessary, update the contact information by
executing:
/usr/sbin/icod_modify -c
contact_e-mail_address
Step 10. Ensure you have installed all of the required HP-UX patches on each
partition. See “Required Patches for HP-UX 11i v1” on page 25 for
details. If necessary, obtain missing patches from the web site:
http://us-support2.external.hp.com. Detailed instructions on
installing each patch are available on this web site.
Step 11. If e-mail connectivity is required (when upgrading to B.06.x), or if asset
reporting is being used with B.07.x: Execute the following command:
/usr/sbin/icod_notify
reply_address
This command verifies that your sendmail configuration is capable of
sending e-mail messages to the hp.com domain. The icod_notify
command needs to be executed with an e-mail address as an argument.
The e-mail address is the address HP uses when responding to the e-mail
sent from the Instant Capacity system and is the e-mail address to which
the HP acknowledgement message is sent.
Using elm, or any e-mail reader, verify receipt of the acknowledgement
e-mail from HP. The message should be received within one hour.