HP Insight Recovery 1.0 Online Help (Document Format)

7 Planned Failovers
Overview
A planned failover typically involves an expected outage at the Primary Site. For example, a planned failover
might be necessary to perform scheduled maintenance, or to react to a severe weather forecast. The following
section describes the steps necessary to perform a planned failover using HP Insight Recovery.
Step 1: At the Primary Site
1. A decision is made to move DR Protected logical servers from the current Primary Site to the Recovery
Site.
2. Shut down the applications and operating system on each HP Insight Recovery DR Protected logical
server.
3. Using the HP Insight Recovery | Sites tab, click Change local site to Recovery. A warning message will
appear explaining what changing to a Recovery Site will do:
The logical server associated with each Recovery Group will be deactivated and disabled.
The role of the site will be changed from a Primary Site to a Recovery Site.
Clicking Continue initiates the site role conversion, and brings up the Jobs screen allowing you to
monitor the progress of the conversion to a Recovery Site.
Step 2: At the original Recovery Site (to be changed to the new Primary Site)
1. Ensure that enough resources are available to run the Recovery logical servers, i.e. sufficient number
of blades (for Virtual Connect-based logical servers) and/or sufficient capacity on ESX hosts (for Virtual
Machine-based logical servers) that are licensed for HP Insight Recovery.
2. Using the HP Insight Recovery | Sites tab, click Change local site to Primary. A warning message
appears, explaining what changing to a Primary Site will do:
HP Insight Recovery will prepare the storage replication group for read/write access, and activate
the associated logical servers. The order of failover is determined by the startup order associated
with each Recovery Group.
The role of the site will be changed from a Recovery Site to a Primary Site.
Clicking Continue initiates the site role conversion, and brings up the Jobs screen allowing you to
monitor the progress of the conversion to a Primary Site.
Notes
If the operation to change the role of the site (Primary to Recovery or vice versa) fails for any reason,
the site role will not be changed. You must correct the problem (see “Monitoring Jobs”) and redo the
operation.
Recovery Groups that have Maintenance Mode enabled will not be included in the Change local Site
to Primary operation.
Related Topics
Click on a link for information on:
“Unplanned Failovers”
“Testing Recovery Groups”
See Also
“Managing Site Configurations”
“Managing Storage Replication Groups”
“Managing Recovery Groups”
“Exporting Site Configurations
Overview 31