HP XC System Software Installation Guide Version 3.1

5.11 Task 10: Start Availability Tools After the Upgrade
Perform this task only if you configured improved availability of services, regardless of the availability
tool you are using. Bypass this task if you did not configure availability sets.
Run the transfer_to_avail command to shut down all services and IP aliases associated with services
that are to be managed by an availability tool.
# transfer_to_avail
NOTE: To avoid duplicating command output here, transfer_to_avail command output shown
on (page 83).
After shutting down all services and IP aliases, the transfer_to_avail command starts each availability
tool. Then, the availability tool starts up the services it is managing.
5.12 Task 11: Verify the Upgrade
Perform all system verification tasks described in Chapter 4 (page 89) to verify that the system is functioning
properly after the upgrade.
108 Upgrading an HP XC System