Installation and Upgrade Guide

Loading the Previous RVU and Resuming Normal
Operations
G06.24 Software Installation and Upgrade Guide528593-005
17-4
Resume Normal Operations
Resume Normal Operations
Resume normal operations by invoking the proper startup files to start system
processes and user applications after falling back to the previous RVU.
Note. If you receive this error message when you attempt to start DSM/SCM:
ERROR: *1081* PATHCTL FILE IS INCOMPATIBLE <COLD START REQUIRED>
1. Stop the $YPHI PATHMON process:
> VOLUME $dsmscm_vol.ZDSMSCM
> STOP $YPHI
2. Run the PATHCOLD macro:
> PATHCOLD
3. Start TMF:
TMFCOM>START TMF
If TMF is not started or running, a TACL error appears.
4. If needed, run the DSM/SCM FALLBACK macro:
a. Stop DSM/SCM if it is not already in the stopped state:
> RUN STOPSCM
b. Run the FALLBACK macro:
> RUN FALLBACK
The FALLBACK macro is interactive and extensive. Answer the prompts accordingly.
5. Start DSM/SCM:
> RUN STARTSCM