Installation and Upgrade Guide

Updating SWAN Concentrator CLIP Firmware
G06.24 Software Installation and Upgrade Guide528593-005
C-22
Step 4: Start the SWAN Concentrator and CLIPs
Step 4: Start the SWAN Concentrator and CLIPs
1. With the Multi-Resource Actions dialog box still open, from the Action list, select
Start.
2. Click Add or Add all.
3. Click Perform Action.
The SWAN CLIPs should start. If they do not, see the SWAN Concentrator and WAN
Subsystem Troubleshooting Guide, section 4. You can also use SCF to start the CLIP
or use the Actions - CLIP dialog box.
If a CLIP Fails to Update (Using OSM)
Use the Actions dialog box to update an individual CLIP.
1. In OSM, right-click the SWAN collection and select Actions from the shortcut
menu.
2. From the Available Actions list, select Stop to stop the CLIP.
3. Select Perform action.
4. Click OK when the “Are you sure you want to do a stop?” message appears.
5. Monitor the progress in the Action Status menu.
a. If the CLIP is still in a Started state, use the SCF STATUS SERVER command
to verify status of the CLIP. For example:
13> SCF STATUS SERVER $ZZWAN.#SWAN2.1*
b. Enter the SCF STOP command similar to the following to stop the SWAN
adapter object:
3> SCF STOP ADAPTER $ZZWAN.#SWAN2.1, SUB ALL