Installation and Upgrade Guide

Hewlett-Packard Company528593-005
i
G06.24 Software Installation and
Upgrade Guide
Glossary Index Tables
What’s New in This Manual xi
Manual Information xi
New and Changed Information xi
About This Manual xiii
Who Should Use This Guide xiii
What This Guide Does Not Cover xiii
How This Guide Relates to Other Manuals xiv
Notation Conventions xv
1. Overview of Installing G06.24
Disk Space Requirements 1-1
System Console Requirements 1-1
TSM Client Applications 1-2
OSM Client-Based Components 1-2
HP NonStop Server Software Requirements 1-3
DSM/SCM and the G06.24 RVU 1-5
Installing Required or Recommended SPRs Before Installing a New RVU 1-5
Installing the G06.24 RVU Using DSM/SCM 1-5
Managing Microcode and Firmware
1-6
Updating Disk and Tape Bootstrap Microcode
1-6
Updating Firmware 1-7
Investigating a New RVU 1-13
Installing a New RVU 1-13
Upgrading NonStop S-Series Servers 1-15
Installing an IOAM Enclosure and Other Components 1-16
Falling Back to the Previous RVU 1-17
Using DSM/SCM FALLBACK and CLEANOSS Macros 1-18
DSM/SCM Client and Server Compatibility 1-19
Using ZPHIRNM 1-19
Resecuring and Licensing Requirements 1-20
NonStop TCP/IP FTP (G06.08) 1-20