User's Manual
Table Of Contents
- HP Moonshot Switch User and Maintenance Guide
- Abstract
- Notice
- Contents
- Component and LED identification
- Operations
- Setup
- Configuration
- Troubleshooting
- Illustrated parts catalog
- Removal and replacement procedures
- Regulatory information
- Electrostatic discharge
- Support and other resources
- Acronyms and abbreviations
- Documentation feedback
- Index
Setup 16
Setup
Installation information and guidelines
Before installing the module, review the following:
• Always install the switch module and the uplink module in corresponding bays. Both components must
be installed for normal operation.
• The switch module and the uplink module can be installed in any order.
• The switch module and the uplink module power down when either module is removed from the chassis.
• The switch module and the uplink module power up after both modules are installed in the chassis.
• Removing any component from bay A or bay B does not disrupt traffic for the other switch.
• Always use the recommended firmware version. For current information on recommended firmware
versions, see the HP website (http://www.hp.com/go/moonshot/download).
• For the most current product information, see the HP Moonshot Information Library
(http://www.hp.com/go/moonshot/docs).