MPE/iX System Utilities Reference Manual (32650-90908)

UPSUTIL for MPE/iX
UPSUTIL Commands
Chapter 32
259
= Yes) by the UPS Monitor Process, that the first UPS device (Ldev# = 22) has completed its initialization
sequence and is now being monitored (Init = Yes and State = Monitoring), and that the other two UPS
devices, Ldevs 23 and 24, are still in the process of being initialized (Init = No and State = Initializing).
Notice that until the initialization process has completed, the UPS Monitor Process does not have information
from the UPS device regarding its hardware status conditions. That is why the Power and Hardware Status
fields for UPS Ldevs 23 and 24 are shown as ???. A few seconds later, the second STATUS display shows
that the initialization processing has been completed for all of the three UPS devices. All three are now being
monitored, and their Power and Hardware Status fields are normal.
--------------------------------------------------------------------------
UPSUTIL: Command > start
--------------------------------------------------------------------------
Begin START UPS Monitor operation
START UPS Monitor operation successfully executed.
End START UPS Monitor operation
--------------------------------------------------------------------------
UPSUTIL: Command > status
--------------------------------------------------------------------------
Begin display of UPS Monitor status.
UPS MONITOR PROCESS STATUS:
UPS Monitor Operating State : Running (PIN = 196)
UPS Monitor Version Number : 9 3 UPS Devices Configured
System Power State : Power is normal. 3 UPS Devices Monitored
Powerfail Recovery Messages : All terminals. 3 UPS Devices Allocated
Configuration File Name : UPSCNFIG.PUB.SYS (Config File Ok)
Powerfail Command File Name : MYPFAIL.PUB.MYACCT (Pfail Cmd File Ok)
Powerfail Command File Parms: [inventory_data_set orders_data_set]
Powerfail Grace Period (secs: 300
Powerfail Grace Timer : Not Running.
Powerfail Command File : Not Running.
Action on UPS Low Battery : Keep Running
UPS DEVICES STATUS:
UPS# Ldev# Alloc Init State Power Hardware Status
~~~~ ~~~~~~ ~~~~~ ~~~~ ~~~~~~~~~~~~ ~~~~~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~