INSTALLATION GUIDE 1
IMPORTANT NOTICE! FOR YOUR SAFETY AND THE LONGEVITY OF YOUR NEW HUGO&BORG CABINETS, PLEASE FOLLOW THE INSTRUCTIONS BELOW: CABINETS SHOULD ALWAYS BE MOVED BY TWO PEOPLE. REMOVE ALL DOORS, DRAWERS AND ADJUSTABLE SHELVES PRIOR TO MOVING ANY CABINET. ALL CABINETS NEED TO BE COMPLETELY INSTALLED TO THE WOOD STUDS BEFORE PUTTING ANY ITEMS INSIDE THE CABINETS. TABLE OF CONTENTS 1. SAFETY & LIABILITY ...................................................................................................................
1. SAFETY AND LIABILITY The decision has been made to install the cabinets and accessories yourself. This installation guide is meant to assist you in the general installation process. The installation of cabinetry can be a challenging task and we do recommend that you use a qualified cabinet installer. However you may have the skill-set to complete the installation on your own.
3. INSTALLATION UNDERSTANDING OUR CABINET CODES (EXAMPLES). All measurements will be referred to in imperial.
1 V erify that walls are square and level. Walls that are not square or level will make installation more difficult. You can use the 3, 4, 5 method shown to check your corner. 2 B efore beginning installation, you must first find the highest point of your floor by checking it with a level. 3 Use a stud finder to mark all the studs that will be used to install your cabinets. 4 D raw a level line at 34 1/2" from the highest point of your floor and another level line at 54" from the same point.
Filler Wall corner 7 S et the next cabinet tight to the first cabinet and use clamps to hold in place while you level it and make sure that the front edges are flush. Attach the two cabinets together using 1 1/8" particle board screws. Attach the cabinet to the wall with 2 1/2" screws into the studs. Continue with the same process for all upper cabinets. 6 I f you do not have a corner, start with the end closest to a wall, making sure to leave room for the required filler, as per your plan.
Filler 9 F or designs without a corner cabinet, start with the first cabinet leaving space for a filler, as per your plan. 10 F or designs with a corner cabinet, set the next cabinet tight to the first cabinet and use clamps to hold it place while you level it, and make sure that the front edges are flush. Attach the two cabinets together using 1 1/8" particle board screws. Attach the cabinet to the wall with 2 1/2" screws into the studs. Continue with the same process for all base cabinets.
BASE AND BASE BLIND CORNER CABINETS 43" - 62" BB45 L/R (base blind corner) cabinets may be pulled out from the corner if required and the room is available. BB45 L/R When installing a base cabinet at a right angle to a BB45 L/R cabinet you must use a filler to provide clearance for door and drawer handles. The filler width required is usually 1 3/4" - 3" depending on the type of pull used on the cabinets. Recommended void space is 6" Cut the 3" filler to required width.
DISHWASHER GABLES Measure 27 1/8" over from the cabinet at the front and the back and draw a line on the floor. This will leave you 24 1/8" between the cabinet side and the start of the filler on the face of the dishwasher panel. Draw a plumb line on the wall from the floor to the base cabinet line. These lines mark the position of the inside of the dishwasher gable. Install a ledger board 27 1/8" long below the base cabinet guideline.
ADJUSTING DOOR HINGES Side Adjustment Using a Phillips screwdriver, rotate screw (1) clockwise to move the door left and counter-clockwise to move the door right. Moves the door up to 2 mm. Depth Adjustment Height Adjustment Using a Phillips screwdriver, rotate screw (2) clockwise to move the door forward and counter-clockwise to move the door backwards. Moves the door up to 2 mm.