Full Product Manual

BEFORE YOU BEGIN
PRE-INSTALLATION CHECKLIST
A structural engineer has approved the mounting structure
The location of the fan will alow for a minumum of two feet of blade clearance
from any obstruction and at least 10 feet of clearance above the floor
The fan location will not be subjected to high winds
If installing multiple fans reference the fan placement chart for optimal spacing
The control panel, motor, and blade assemblies are all marked with the
diameter ensure the markings all match.
The control panel voltage markings
(100-120VAC) should match your building
supply power.
The fan power should be ran to 5 feet outside the swept area of the fan. Please
refer to the chart on page19 for the appropriate receptacle and breaker size.
7