NOTE: A. To avoid removing concrete ooring, begin lineup
leveling from the highest point of the store oor.
B. When wedges are involved in a lineup, set them rst.
All cases were leveled and joined prior to shipment to
insure the closest possible t when cases are joined in
the eld. When joining, use a carpenters level and shim
legs accordingly. Case must be raised correctly, under legs
where support is best, to prevent damage to case.
1. Check level of oor where cases are to be set.
Determine the highest point of the oor; cases will
be set off this point.
2. Level and set the rst case, carefully guiding the
electrical, refrigeration and drain lines through the
parent case. Case must be raised under legs where
support is best to prevent damage to case. Internal
bracing may be removed at this time.
3. Set second case as close as possible to the rst
case carefully guiding its electrical, refrigeration and
drain lines through the parent case, and level case
to the rst using the instructions in step one.
4. Apply masking tape 1/8” in from end of case on inside
and outside rear mullion on both cases to be joined.
5. Apply liberal bead of case joint sealant (butyl) to
(dotted area shown in gure) rst case. Apply heavy
amount to cover entire shaded area.
DO NOT USE PERMAGUM!
Fig. 2, #1
It is the contractor’s responsibility to install
case(s) according to local construction and
health codes.
6. Slide second case up to rst case snugly. Then level
second case to the rst case so glass front, bumper
and top are ush.
Do not use the top bracket on the
rear mullion to pull the cases together.
7. To compress silicone at joint, use two Jurgenson
wood clamps. Make sure case is level from front to
back and side to side on inside bulkheads at joint.
8. Attach sections together with the two 3/8” bolts
provided, below the deck at the mullion towards the
rear of the FMSS-L. Remove clamps.
9. Apply bead of silicone to top of bulkheads and slip
on stainless steel bulkhead cap. Also apply silicone
to seam between overhead light tubes.
10. VERY IMPORTANT! Apply liberal amounts of black
silicone to ll all voids down to bulkhead.
Proper case-joint sealing is
extremely important to prevent
water leaks!
11. Use nger to smooth silicone as thin as possible at
masking tape on inside and outside of rear mullion
(apply additional silicone if necessary). Remove
tape applied on line #3.
Joint Trim
After cases have been leveled and joined, and refrigeration,
electrical, and wasted piping work completed, install the
splashguards. Fasten along the top edge, or center, with
#10 X 3/3” sheet metal screws.
DO NOT SEAL JOINT TRIM TO FLOOR!
Installation (Cont'd)