Installation Guide

12
STEP 3: HANGING CHANNEL
Components Needed
Hanging rail (A)
Hanging channel (C)
#12 x 2-1/2”
Tools Recommended
Determine and Measure center point for installation on desired structure wall
FIRST: Place hanging rail in desired position
on structure wall or roof fascia board and
mark first hole to be drilled in hanging rail
relative to rafters or wall studs.
Widths greater than 16 ft will require two
hanging rails connected at center point.
SECOND: Place a mark 1” down from top
hanging rail and drill ¼” into each rafter or
studs across length of hanging rail.
Keep level across hanging rail span.
Hanging rail will connect directly to structure
wall (lumber shown not required unless
masonry surface)
THIRD: Slide hanging channel into bottom of
hanging rail then fasten hanging rail with #12
x 3 screws to fascia board or wall across
entire rail.
Place a generous bead of seal across entire
span between rail/wall space.
Hanging rail & Hanging channel with foam
insert will not be labeled as shown in image.