Network Card User Manual

46 MPCMM0001 Chassis Management Module Software Technical Product Specification
Process Monitoring and Integrity
6.7.2 Successful Restart Recovery
In this scenario PMS detects a process fault. The configured recovery action is: restart the process.
The PMS is able to successfully recover the process by restarting it.
Table 6. No Action Recovery
Description Event String UID Assert Severity
PMS detects a faulty process. The
mechanism (existence, thread
watchdog, or integrity) used to detect
the fault will determine which of the
event type strings will be used.
Process existence fault;
attempting recovery or
Thread watchdog fault; attempting
recovery or
Process integrity fault; attempting
recovery
# Assert Configure
The recovery action specified is "no
action".
Take no action specified for
recovery
# N/A Configure
No attempt will be made to recover
the process. The PMS will stop
monitoring the process.
See Section 6.7.11, “Process
Administrative Action” on page 53, for
information about how to re-enable
monitoring and de-assert the event.
Process existence fault;
monitoring disabled or
Thread watchdog fault; monitoring
disabled or
Process integrity fault; monitoring
disabled
# Assert Configure
Table 7. Successful Restart Recovery
Description Event String UID Assert Severity
PMS detects a faulty process. The
mechanism (existence, thread
watchdog, or integrity) used to detect
the fault will determine which of the
event type strings will be used.
Process existence fault;
attempting recovery or
Thread watchdog fault; attempting
recovery or
Process integrity fault; attempting
recovery
# Assert Configure
The recovery action specified is
"process restart".
Attempting process restart
recovery action
# N/A Configure
PMS was successfully able to restart
the process
Recovery successful # De-assert OK