Intel® Server System R2000LH2/LT2 Product Family Quick Installation User's Guide Thank you for buying an Intel® Server System. The following information will help you assemble your Intel® Server System and install components. If you are not familiar with ESD [Electrostatic Discharge] procedures used during system integration, see the complete ESD procedures described in your Service Guide. This guide and other supporting documents are located on the web at: http://www.intel.com/support.
(This page is intentionally left blank.
Table of Contents System Overview .............................................................................................................................. 1 General Installation Process ........................................................................................................ 2 Preparing System ................................................................................................................ 2 Remove Power Supply Module ......................................................
Warning Warning Caution Read all caution and safety statements in this document before performing any of the instructions. Also see the Intel ® Server Board and Server Chassis Safety Information document at: http://www.intel.com/support/ motherboards/server/sb/cs-010770 .htm for complete safety information. Installation and service of this product to be performed only by qualified service personnel to avoid risk of injury from electrical shock or energy hazard.
System Overview Intel® Server System R2000LH2/LT2 Product Family System Features and Components 1+1 Redundant Power Supply Modules CPU2 CPU 3 Add-in Card Riser Assembly Server Board System Fans Optical Drive Bay CPU1 al tic e Op vic bly De em s As Air Duct Hard Drive Bays Ai rd uc t Front Control Panel CPU4 * 3.5" Hard Drive Bay system as shown Useful Information: • The SCU1 (4-7) port requires an Intel® RAID C600 Upgrade Key installed to be functional.
General Installation Process The installation instructions in this section are for common components of Intel® Server System R2000LH2/LT2 Product Family. 1 Minimum Hardware Requirements To avoid integration difficulties and possible board damage, your system must meet the following minimum requirements: Preparing System Observe normal ESD (Electrostatic Discharge) procedures. • Processor: Intel® Xeon® processor E5-4600 product family.
General Installation Process 6 Remove Processor Heatsink(s) IMPORTANT! Before proceeding further, check your Intel® Server System for disconnected or loose cables and components that may have occurred during shipping. A 3 The heatsink is attached to the server board and/or processor socket with captive fasteners.
General Installation Process Install Processor(s) ...continued t C LO t RE M OV E 1s P EN 1s t DIMM notch and socket bump must align as shown below. 3 D 1 C E 4 TIM C A LO S E 1s t O P 1s t Pr o So ces ck so et r EN DDR3 sis Other Memory t on Fr Repeat steps C and D by giving each screw two rotations each time until each screw is lightly tightened up to a maximum of 8 inch-lbs torque.
General Installation Process Install Memory Modules ...continued To Install DIMMs: Open both DIMM socket levers. C Insert DIMM making sure the connector edge of the DIMM aligns correctly with the slot. D Push down firmly on the DIMM until it snaps into place and both levers close. E IMPORTANT! Visually check that each latch is fully closed and correctly engaged with each DIMM edge slot. 10 C E CAUTION: Avoid touching contacts when handling or installing DIMMs.
General Installation Process Install Hard Drives ...continued al tic e Op vic bly De em s As 3.5" Hard Drive Carrier (For system with 3.5" hard drive bay only) C BRE 2.5´´BEFOR AK OF HAR E MO F TAB D D UTIN RIV G E TO P B Remove the drive carrier by pressing the green button and opening the lever. B Remove the four screws securing the HDD interface bracket and remove the HDD interface bracket. TO P AB G F T TIN E OF OU IV K M DR EA RE RD BR EFO HA B 5´´ 2. A C Slide the carrier out.
General Installation Process Internal Fixed 2.5" SSD Drive Carrier B. Slide the Front End Module A. Remove the Rack Handles Remove the six screws securing the front end module from the chassis. B Slide the front end of the module forward a little. A A al tic e Op evic bly D em s As A A Remove the two screws securing the rack handle from the chassis and then remove the rack handle. A B C. Install Internal SSD(s) A A Remove the two screws to release the Solid State Drive carrier.
General Installation Process 11 A Install Optical Drive Install the plastic guide onto the back of the drive and attach with two screws as shown. B Insert the optical drive into chassis opening and push all the way until it stops. C Connect the cables as shown. IMPORTANT NOTE: If you do not install a device at this location, install the optical device bay filler panel shown below. This is required to maintain proper system cooling.
General Installation Process 14 C Install Air Duct A Bend and slide in the air duct. B Install the air duct into the chassis. C Flip-down the tilt bay. A B A al tic e Op vic bly De em s As NOTE: Take care to avoid pinching system cables. 15 Install Add-in Card(s) A For Half-length PCI Add-in Card(s) A Remove the filler panel from the add-in card slot and install the provided proper bracket as shown. B Insert add-in card until it sits in the riser connector.
General Installation Process 16 Install Add-in Card Riser Assembly B NOTE: Please make sure the release lever is in UP position before installing the add-in card riser assembly. A Position the riser card connector edge over the server board riser socket and align the riser bracket to the plastic guides on the chassis. B Press down the release lever to install the riser assembly into the riser socket.
General Installation Process 20 Finishing Up Before installing your operating system, you must finish your system installation, make I/O connections, and plug in power cord(s). Add-in Card Slots 1. Verify the system top cover is installed. 2. Install the server into the rack using the instructions provided with the rack mounting kit. 3. Connect your USB keyboard/mouse, video, and other I/O cables/devices as shown. Then connect the power cord(s).
Reference Front Panel Controls and Indicators Standard Control Panel Your system may include one of two front control panel types. The features of each are as follows: A. ID Button with integrated LED B. NMI Button C. LAN-1 Activity LED D. LAN-3 Activity LED E. System Cold Reset Button F. System Status LED G. Power Button with integrated LED H. HDD Activity LED I. LAN-4 Activity LED J.
Reference System Fan Connection FAN 11 FAN 9 FAN 10 FAN 8 System Fan Board FAN 7 FAN 6 FAN 5 FAN 4 FAN 3 FAN 2 Air F FAN 1 low 11 10 9 al tic e Op vic bly De em s As 8 A complete list of accessories and spares can be found at http://www.intel.com/p/en_US/support/.
Reference System Cabling Diagram For System with 4 x 3.5" Hard Drive Bay NOTES: • To activate the port SCU1 (4-7) on the server board, a proper Intel® RAID C600 Upgrade Key must be installed. For instructions, see Intel® RAID C600 Upgrade Key Installation Guide. • A second SSD is supported when the optical drive is NOT in use.
Reference System Cabling Diagram For System with 8 x 2.5” Hard Drive Bay: NOTES: • To activate the port SCU1 (4-7) on the server board, a proper Intel® RAID C600 Upgrade Key must be installed. For instructions, see Intel® RAID C600 Upgrade Key Installation Guide. • A second SSD is supported when the optical drive is NOT in use.
G54804-003