Local Control Panel Kit Install Guide: Intel® Entry Server Chassis SC5275-E UP/DP/WS/BRP Intel® Entry Server Chassis SC5299-E DP/WS/BRP Intel® Server Chassis SC5300 Intel® Server Chassis SC5400 A Guide for Technically Qualified Assemblers of Intel® Identified Subassemblies/Products Intel Order Number: C77420-002
Disclaimer Information in this document is provided in connection with Intel® products. No license, express or implied, by estoppel or otherwise, to any intellectual property rights is granted by this document.
Safety Information Important Safety Instructions Read all caution and safety statements in this document before performing any of the instructions. See also Intel Server Boards and Server Chassis Safety Information on the Intel® Server Deployment Toolkit CD and/or at http://support.intel.com/support/ motherboards/server/sb/cs-010770.htm. Wichtige Sicherheitshinweise Lesen Sie zunächst sämtliche Warnund Sicherheitshinweise in diesem Dokument, bevor Sie eine der Anweisungen ausführen.
Safety Information Warnings Heed safety instructions: Before working with your server product, whether you are using this guide or any other resource as a reference, pay close attention to the safety instructions. You must adhere to the assembly instructions in this guide to ensure and maintain compliance with existing product certifications and approvals. Use only the described, regulated components specified in this guide.
Contents Contents Safety Information ..................................................................................................... iii Important Safety Instructions ................................................................................................ iii Wichtige Sicherheitshinweise ............................................................................................... iii Consignes de sécurité ......................................................................................
Contents Replace Bezel .......................................................................................................................... 24 Replace Access Cover .............................................................................................................
List of Figures List of Figures Figure 1. Removing Access Cover............................................................................................. 2 Figure 2. Removing Bezel Assembly ......................................................................................... 3 Figure 3. Removing Outer Bezel Door from Bezel Assembly ................................................... 4 Figure 4. Removing Upper One-third of Bezel Grill ..................................................................
List of Figures viii Local Control Panel Kit Install Guide
1 Local Control Panel Kit Installation Instructions Use the instructions in this installation guide to install a Local Control Panel display on an Intel® Server Chassis SC5300, Intel® Server Chassis SC5400, Intel® Entry Server Board SC5275-E or Intel® Entry Server Chassis SC5299-E. Note: For the Local Control Panel to function properly on an Intel® server board, you will need to install an Intel® Management Module on the server board.
Local Control Panel Kit Installation Instructions Tools and Supplies Needed • Phillips* (cross head) screwdriver (#1 bit and #2 bit) • Anti-static wrist strap and conductive foam pad (recommended) System References All references to left, right, front, top, and bottom assume the reader is facing the front of the chassis as it would be positioned for rack-mount operation.
Local Control Panel Kit Installation Instructions Remove Bezel Assembly Release the two plastic tabs (see letter “A” in the following figure) on the left side of the bezel assembly to disengage the tabs. Rotate the bezel assembly (see letter “B”) no more than 40 degrees outward. At a 40-degree angle, push the bezel assembly away from the chassis (see letter “C”).
Local Control Panel Kit Installation Instructions Remove Outer Bezel Door from Bezel Assembly Note: The bezel assembly consists of two parts, an inner bezel door and an outer bezel door. With one hand supporting the inner bezel door, use your other hand to push the outer bezel door away from the inner bezel door. The outer bezel door will disengage from the inner bezel door at the four hinges (see letter “A” in the following figure).
Local Control Panel Kit Installation Instructions Remove Upper Third of Bezel Grill Remove the upper one-third of the bezel grill by pushing grill forward. TP00636 Figure 4. Removing Upper One-third of Bezel Grill Install LCP Grill Install new LCP grill into outer bezel door by pressing grill in from the front. TP00637 Figure 5.
Local Control Panel Kit Installation Instructions Remove Lowest CD-ROM/DVD Drive Filler Panel Remove the lowest CD-ROM/DVD/Floppy drive or filler panel from chassis. TP00638 Note:Removal of CD-ROM drive shown. Figure 6.
Local Control Panel Kit Installation Instructions Install EMI Shield onto LCP Carrier Your backplane board shipped with an EMI shield that has to be installed. Install the EMI shield by aligning the middle tooth (see letter “A” in the following figure) with the indentation in the side of the LCP carrier. A TP00635 Figure 7. Installing EMI Shield on LCP Carrier Inserting LCP Carrier into Drive Bay of Server Chassis 1. Attach drive rails to LCP carrier using the top set of holes. TP00634 Figure 8.
Local Control Panel Kit Installation Instructions 2. Feed the LCP cable through the drive bay opening. Slide LCP carrier into server chassis. Make sure that the drive rails are using the correct slots in the chassis. TP00639 Figure 9. Installing LCP Carrier Route LCP Cable Route the LCP cable under the chassis fan area (along side the floppy and IDE cables) to the corner of the server board where the LCP header is located on your Intel® server board.
Local Control Panel Kit Installation Instructions Connect LCP Cable to LCP Header of Server Board 1. Connect the LCP cable to the LCP header on the server board. 2. For an Intel Server Board SE7520AF2, use header J1J1 on the server board. TP00642 Figure 11.
Local Control Panel Kit Installation Instructions 3. For an Intel Server Board SE7520BD2, use header J2K8 on the server board. TP00641 Figure 12. Attaching LCP Cable to Header on Intel® Server Board SE7520BD2 Replace Bezel Assembly Fit the right-hand side of the inner bezel door against the right-hand side of chassis and engage plastic bezel hooks (see letter “A” in the following figure) into raised metal slots at chassis edge.
Local Control Panel Kit Installation Instructions Caution: Do not attach inner bezel door to chassis at more than a 40-degree angle or you may damage the bezel hooks at the right-hand side of the door. C A C B TP01130 Figure 13. Installing Inner Bezel Door Replace Access Cover Replace access cover and slide forward to secure cover to chassis. Replace shipping screw (see letter “A” in the following figure) if desired. A TP01000 Figure 14.
Local Control Panel Kit Installation Instructions Installation Instructions for Intel® Entry Server Chassis SC5275-E Note: This section only applies to Local Control Panel kit installations for the Intel® Entry Server Chassis SC5275-E. If you are installing a Local Control Panel kit into an Intel® Server Chassis SC5300/SC5400, follow the instructions under “Installation Instructions for Intel® Server Chassis SC5300/SC5400” on page 2.
Local Control Panel Kit Installation Instructions Remove Bezel To remove the bezel: 1. Disengage the two bezel tabs (see letter “A” in the following figure) from the chassis. 2. Rotate the left side of bezel outward slightly (see letter “B”). 3. Disengage the latches that attach the right side of the bezel to the chassis and remove (see letter “C”). Figure 16. Removing Bezel Remove Lowest CD-ROM/DVD Drive Filler Panel Remove the lowest CD-ROM/DVD/floppy drive or filler panel from chassis.
Local Control Panel Kit Installation Instructions Install EMI Shield onto LCP Carrier Your backplane board shipped with an EMI shield that has to be installed. Install the EMI shield by aligning the middle tooth (see letter “A” in the following figure) with the indentation in the side of the LCP carrier. A TP00635 Figure 18. Installing EMI Shield on LCP Carrier Inserting LCP Carrier into Drive Bay of Server Chassis 1.
Local Control Panel Kit Installation Instructions 2. Feed the cable in first. Slide the LCP carrier into desired 5.25-in drive bay and secure with two screws to the front of chassis. Figure 20. Inserting LCP Carrier into Drive Bay Route LCP Cable Route the LCP cable to the corner of the server board where the LCP header is located on your Intel® Server Board SE7520AF2 or Intel® Server Board SE7520BD2. TP00646 Figure 21.
Local Control Panel Kit Installation Instructions Connect LCP Cable to LCP Header on Server Board 1. Connect the LCP cable to the LCP header on the server board. 2. For an Intel® Server Board SE7520AF2, use header J1J1 on the server board. TP00648 Figure 22.
Local Control Panel Kit Installation Instructions 3. For an Intel® Server Board SE7520BD2, use header J2K8 on the server board. TP00647 Figure 23. Attaching LCP Cable to Header on Intel® Server Board SE7520BD2 Replace Bezel 1. If necessary, remove filler panel from bezel that corresponds to the position of the LCP carrier. 2. Engage the three clips (see letter “A” in the following figure) at the right edge of the bezel with the corresponding latches on the right side of the chassis. 3.
Local Control Panel Kit Installation Instructions 4. Snap the two bezel tabs (see letter “C”) into their corresponding recesses at left edge of chassis. Figure 24. Installing Bezel Replace Access Cover To replace the access cover: 1. Position access cover on chassis (see letter “A” in the following figure). 2. Slide the two thumb latches (see letter “B”) to the CLOSED position. 3. (optional) Replace shipping screws (see letter “C”).
Local Control Panel Kit Installation Instructions Installation Instructions for Intel® Entry Server Chassis SC5299-E Note: This section only applies to Local Control Panel kit installations for the Intel® Entry Server Chassis SC5299-E. If you are installing a Local Control Panel kit into an Intel® Server Chassis SC5300/SC5400, follow the instructions in “Installation Instructions for Intel® Server Chassis SC5300/SC5400” on page 2.
Local Control Panel Kit Installation Instructions 2. Rotate the left side of bezel outward slightly (see letter “B”). 3. Disengage the latches that attach the right side of the bezel to the chassis and remove (see letter “C”). C A C C A B TP02034 Figure 27. Removing Bezel Remove Lowest CD-ROM/DVD Drive Filler Panel Remove the lowest CD-ROM/DVD/floppy drive or filler panel from chassis. AF00566 Note:Removal of CD-ROM drive shown. Figure 28.
Local Control Panel Kit Installation Instructions Install EMI Shield onto LCP Carrier Your backplane board shipped with an EMI shield that has to be installed. Install the EMI shield by aligning the middle tooth (see letter “A” in the following figure) with the indentation in the side of the LCP carrier. A TP00635 Figure 29.
Local Control Panel Kit Installation Instructions Inserting LCP Carrier into Drive Bay of Server Chassis Slide the LCP carrier into the desired 5.25-in drive bay. Feed the cable in first. AF00567 Figure 30. Inserting LCP Carrier into Drive Bay Route LCP Cable Route the LCP cable to the corner of the server board where the LCP header is located on your Intel® Server Board S5000VSA, Intel® Server Board S5000PSL or Intel® Server Board S5000XVN. AF00568 Figure 31.
Local Control Panel Kit Installation Instructions Connect LCP Cable to LCP Header on Server Board 1. Connect the LCP cable to the LCP header on the server board. 2. For an Intel® Server Board S5000VSA, use header J1J6 on the server board. AF00569 Figure 32. Attaching LCP Cable to Header on Intel® Server Board S5000VSA 3. For an Intel® Server Board S5000PSL or Intel® Server Board S5000XVN, use header J2J1 on the server board. AF00570 Figure 33.
Local Control Panel Kit Installation Instructions Replace Bezel 1. If necessary, remove filler panel from bezel that corresponds to the position of the LCP carrier. 2. Line up the three clips (see letter “A” in the following figure) at the right edge of the bezel with the corresponding latches on the right side of the chassis. 3. Engage the clips with the slots (see letter “B”). 4. Rotate the left side of bezel towards the chassis (see letter “C”). 5.
Local Control Panel Kit Installation Instructions Replace Access Cover To replace the access cover: 1. Slide the access cover on the chassis and latch securely (see letter “A” in the following figure). 2. (optional) Replace shipping screws (see letter “B”). Caution: This chassis must be operated with the access cover installed to ensure proper cooling. B A B TP00831 Figure 35.
Local Control Panel Kit Installation Instructions 26 Local Control Panel Kit Install Guide