User Manual

j a c l o i n d u s t r i e s | 129 Dermody Street Cranford, NJ 07016
p 908.653.4433 | 800.852.3906 f 908.653.1717 | 800.852.4133 JACLO.COM
|
PG 12
CREATED 5.2014
(6) System Check Continued
(7) Reinstall rough in shield
(8) Finished wall opening
A. Minimumopeningsizeopeningtooperatecheckstops,removingthermostaticanddivertercartridges
isrequired.
B. SeeFig.1formaximumnishedwallopening.
(9) Thermostatic valve set up
A. Removeroughinshieldanddiscardiftrimistobeinstalledaftervalvesetup.
B. Removemaxtemp.taganddiscard.
C. Screwsleeveontothermostaticvalvebodyuntilitbottomsonstopring,toretainstopring.SeeFig.5
D. Placediverterinoffpositionandclosevolumecontrolvalvesifused.SeeFig.8fordiverteroperation
E. Openhotandcoldcheckstops,seeFig.5.
F. Opendivertertoallowwaterow,rotatethermostaticvalvefullcounterclockwiseandcheckwater
temperaturewiththermometer.Factorysettingshouldbe100°maximum.SeeFig.6.
G. Limitstopsetup:

i. Removelimitstops,Fig.5
ii. Opendivertertoallowwaterow,runwaterfor5min.SeeFig.6.
iii. Measurewatertemperaturewhilerotatingspindlecounterclockwise.Stoprotationathighestdesired
watertemperaturetostabilizeforoneminute,conrmdesiredsetting.SeeFig.5&6.
iv. Replacehotlimitstopsolegisrestingagainststopring.SeeFig.5
v. Rotatespindlegentlyclockwiseuntilwateriscoldandspindlestopsrotating.
 DO NOT ROTATE SPINDLE PAST STOP POSITION. THIS WILL DAMAGE THE CARTRIDGE!
vi. Replacecoldlimitstopsolegisrestingagainstthestopring.SeeFig.5.
vii. Turnoffdivertervalve.SeeFig.6.
J-THVC12
J-20682
3 1/4"
3 1/4"
1/2" DIA.
3/8" DIA.
4"
4 1/2"
6 13/16"
A
PORT
C
PORT
AB ON
BC ON
B
ON
B
PORT
INLET
16 PT.
SPLINE
A ON C ON