Installation Guide

Pure Air
®
Bath
Installation and Operation www.jacuzzi.com Page 11
English
Flashing
Exploded View
1˝x4˝
(25mm x 101mm)
Not For Support
Mortar or
Adhesive
Suboor
Sealant
Tile
Complete the bathtub surround installation (Figure 7).
1
Installdrain/overowaccordingtothe
manufacturer’s instructions. Refer also to the
TechnicalSpecicationsManual.
Watertight installation of the drain is the installer’s
responsibility. Drain leakage is excluded from the
Jacuzzi Luxury Bath warranty of this product.
2
Install the faucet at this time. It is recommended
thatthefaucetbeinstalledbyaqualiedplumber.
Proper installation of the spout plumbing and
compliance with local codes are the responsibility of
the installer. Jacuzzi Luxury Bath does not warrant
connectionsofwatersupplyttingsandpiping,
llsystems,ordrain/overowsystems.Norisit
responsible for damage to the bathtub which may
occur during installation.
Anon-ammableprotectivebarriermustbeplaced
between the soldering work and the bathtub unit to
prevent damage to the bathtub.
3
Prepare the cut-out hole for the bathtub using
either the provided full scale template or the cutout
dimensionslistedintheTechnicalSpecications
Manual.
The template may show guides for more than one
bathtub, be certain to select the appropriate guide
lines. If undermounting is an option, be careful to
select the guide lines that apply to the installation
that you are performing.
4
Completealldecknishworkandcovertoprotect
from damaging while placing the bathtub.
5
Insulation may be placed within the bathtub
surround.
Provide adequate ventilation around the blower to
ensuresufcientairowandcooling.Donotblock
blower intake for any reason. Do not insulate the
blower for any reason. Keep blower clear of all
debris.
6
Turn off power supply to dedicated GFCI protected
circuits.
7
Place a piece of scrap lumber on each of the ends
of the cutout – this will be used as a temporary
support prior to lowering the bathtub fully into the
opening (Figure 8).
Tile or Finished
Surface
Substrate
Scrap Lumber
Support
Member
FlatSuboor
Scrap Lumber
Minimum3˝
(76mm)
Clearance
Figure 7 - Surround Installation
Figure 8 - Drop-In Installation
Before you begin your installation, please read the following:
Drop-in Installation
•
Observe all local and building codes.
•
Determine which tools will be used during the installation.
•
Additional bathtub drain parts and plumbing are commercially available at plumbing and hardware stores.
•
Drain/Overowrough-ininformationisincludedwithyourbathtubintheTechnicalSpecicationsManual