Installation Guide

Pure Air
®
Bath
Page 12 www.jacuzzi.com Installation and Operation
English
8
Installtheunit,insertingtheblowerendrst,
lowering the bathtub into the opening as shown in
the illustration (Figure 9).
DONOTuseplumbingxturesorlinestolowerthe
unit. Allow the bathtub to rest on the supports.
Drop-in Installation (con’t)
FlatSuboor
FlatSuboor
Scrap Lumber
Figure 11 - Support
Figure 10 - Support
Figure 9 - Drop-In (side view)
Minimum2˝
(50mm) Max
Thickness
Tile or
Finished
Surface
Member Support
Substrate
9
Inspectallttings,plumbing,andcontrol
lines after inserting the bathtub to insure the
components are not damaged, disconnected, or
contactingthenishsurfacesubstrateorsupport
members.
10
Connectexwatersupplylinestofaucetandplug
power cords into GFCI outlet.
11
Remove scrap lumber and lower the bathtub fully
into the opening (Figures 10 and 11).
The bathtub must be fully supported from the
bottom.Thebathtubmustrestonthesuboor,or
be in contact with the leveling material.
12
Align the bathtub and connect the drain.
13
Turn on the power supply to the dedicated GFCI
protected circuits and check system operation.
14
Caulk around the perimeter of bathtub to seal
thespacebetweentherimandthenisheddeck
(Figure 7 on previous page).
Uneven
Suboor
Floating
Floor
Compound