Installation Guide

• NEVER use high-speed power tools (e.g. saws, grinders, etc.) to cut James Hardie
®
products indoors as they may generate excessive silica dust.
NEVER dry sweep – Use wet suppression methods or HEPA vacuum for clean-up.
• To further limit respirable silica exposures, wear a properly-tted, NIOSH-approved
dust mask or respirator (e.g. N-95) in accordance with applicable government
regulations and manufacturer instructions.
1 | English
CUTTING
HARDIEBACKER
®
BOARD
• Use a straight edge as a guide to score
the board’s face and snap upward
along the score line. We recommend
using a carbide-tipped scoring knife,
but a utility knife may also be used.
The use of shears (manual, electric or
pneumatic) is also acceptable.
For cutouts and small holes, score
around perimeter and break out from
the face side with hammer.
COUNTERTOP INSTALLATION
1 | Ensure cabinets are level and
secure
• Use minimum 1/2” exterior grade
plywood or equivalent, positioned
across the wood cabinet. Space
between plywood supports is not to exceed 16” on center.
2 | Determine layout of HardieBacker
®
cement board
Do not align HardieBacker cement board with plywood joints.
Score and snap boards to required sizes and make necessary cutouts.
We recommend an 1/8” gap from board edges.
3 | Attach HardieBacker cement board to countertop
Apply a supporting bed of dry-set mortar or modied thinset to plywood with a 1/4”
square-notched trowel. Mastic can also be used with a 5/32” V-notched trowel.
• Use the fastener pattern as a guide. Fasten HardieBacker cement board with
specied nails or screws (as listed in “Materials Required”) every 8” over the entire
surface. Keep fasteners between 3/8" and 3/4" from board edges and 2" from
board corners.
4 | Tape joints prior to tiling
• Prior to setting the tile, ll all joints with the same mortar used to set the tiles.
• Embed 2” wide high-strength alkali-resistant glass ber tape in the mortar and level.
5 | Exterior application (HardieBacker 500 only)
Additional details on page 4
• Follow Countertop installation steps 1 thru 4
• Mastic (organic adhesives) shall not be used in exterior applications