Installation Guide

COM1220-P2/4 01/20
HardiePanel
®
Vertical Siding
stud
furring
strip**
Batten Joint
Figure 1
moderate
contact
plate
keep nails
3/8 in. (9.5mm) min.
from panel
edges
water-resistive
barrier***
stud
HardiePanel
siding
Figure 4
Recommendation: When
installing Sierra 8 panel,
provide a double stud at
panel joints to avoid nailing
through grooves.
Figure 3
Caulk Joint
leave appropriate gap between
panels, then caulk*
Batten Joint
(Not applicable to ColorPlus
®
Finish)
Figure 2
lower panel
Z-flashing
Do not caulk
upper panel
¼ in. (6mm) gap
lower panel
Z-flashing
Do not caulk
upper panel
¼ in. (6mm) gap
decorative
band board
A: Water Resistive Barrier Condition
Refer to Table 1 for correct installation condition
water-resistive
barrier***
water-resistive
barrier***
stud
stud
* Apply caulk in accordance with caulk manufacturer’s written
application instructions.
** Furring as prescribed in Table 1.
*** WRB or Drainage Plane as prescribed in Table 1.
Figure 4
Figure 3
Caulk Joint
leave appropriate gap between
panels, then caulk*
(Not applicable to ColorPlus
®
Finish)
Figure 2
lower panel
Z-flashing
Do not caulk
upper panel
¼ in. (6mm) gap
lower panel
Z-flashing
Do not caulk
upper panel
¼ in. (6mm) gap
decorative
band board
B: Drainage Plane/Wrap Condition
drainage
wrap***
stud
Figure 1
moderate
contact
plate
drainage wrap***
stud
HardiePanel
siding
drainage wrap***
stud
Figure 4
Figure 3
Caulk Joint
leave appropriate gap between
panels, then caulk*
(Not applicable to ColorPlus
®
Finish)
Figure 2
lower panel
Z-flashing
Do not caulk
upper panel
¼ in. (6mm) gap
lower panel
Z-flashing
Do not caulk
upper panel
¼ in. (6mm) gap
decorative
band board
C: Furring/Rainscreen Condition
water-resistive
barrier***
Figure 1
moderate
contact
plate
keep nails
3/8 in. (9.5mm) min.
from panel
edges
water-resistive
barrier***
stud
HardiePanel
siding
furring strip**
Batten Joint
water-resistive
barrier***
stud
furring strip**
water-resistive
barrier***
water-resistive
barrier***
drainage wrap*** drainage wrap***
keep nails
3/8 in. (9.5mm) min.
from panel
edges
Recommendation: When
installing Sierra 8 panel,
provide a double stud at
panel joints to avoid nailing
through grooves.
Recommendation: When
installing Sierra 8 panel,
provide a double stud at
panel joints to avoid nailing
through grooves.
INSTALLATION:
Fastener Joint Treatment
Position fasteners 3/8 in from panel edges and no closer than 2 in away from corners. Do not nail into corners.
• HardiePanel vertical siding must be joined on stud.
• Double stud may be required to maintain minimum edge nailing distances.
When screws are used to attach panels to steel studs/furring,
the screws shall have wing tips. If screws do not have wing tips,
then pre-drilling is required. (Not applicable when using pins)
Follow chart below for pre-drilling:
• Vertical Joints - Install panels in moderate contact (fig. 1),
alternatively joints may also be covered with battens, PVC
or metal jointers or caulked (Not applicable to ColorPlus
®
Finish) (fig. 2).
• Horizontal Joints - Provide Z-flashing at all horizontal
joints (fig. 3).
SCREW PRE-DRILL HEAD DIAMETER
No. 8 7/32 in Min 0.323 in
No. 10 1/4 in Min 0.323 in
2 in
(50 mm)
3/8 in
(9.5 mm)
2 in
(50 mm)
3/8 in
(9.5 mm)
2 in
(50 mm)
3/8 in
(9.5 mm)