Manual

© 2010 Jaypro Sports Equipment BBC-700B-M 02-08-2012
11 of 24
FIGURE 3 - MOTOR ASSEMBLY
INSTALL FIRST DRIVE PIPE CARRIER STRUT AND ASSEMBLY.
1. The next attachment is that of the first Drive Pipe carrier assembly to unistrut that is
located 1’ from the motor reference point to be located within the perimeter of the
cage.
2. Attach this piece of strut to the beam with usistrut beam clamps.
3. Attach a loosely assembled Drive Pipe Carrier Assembly, (DPC-A), to the strut.
4. Establish the required Drive Pipe Centerline AFF for the carrier.
5. Secure all nuts to mount the assembly to the strut.