Manual

© 2010 Jaypro Sports Equipment BBC-700B-M 02-08-2012
6of 24
INSTALLATION PROCEDURES
Important Note: The following installation procedures show the installation of a batting
cage being directly attached to a single I-beam or bar joist, using the BBC-UBKIT
mounting kit. Alternate mounting kits are available to attach cages between bar joists
(BBC-UP5KIT, BBC-KIT58) and perpendicular to bar joists (BBC-PERPKIT).
Although this document explains the steps in laying out the cage and drive assembly,
refer to the individual mounting kit instructions for installing the support structure.
Only trained personnel, familiar with the use of common power tools, should attempt to
install the batting cage and support structure.
TOOLS REQUIRED:
Standard Sockets.
Open ended wrenches.
Allen Wrench Set
Screwdrivers
Electric Drills
Electric Saws
Cable Cutters
Measuring devises
Levels and plumb bobs or lasers
Lifts and or scaffolding
Blocking wood
Duct tape
Thread Lock liquid
5/16” Nut Drivers
.
SKILLS:
Installation should be by persons with experience in indoor athletic equipment assembly.
Contact Jaypro Sports for a recommendation of a certified installer in your area.
UNPACKAGE AND VERIFICATION
1. Verify that all your parts are accounted for
2. Verify that no parts were damaged in shipment.
3. Layout all parts and identify for assembly
4. The winch should be unpackaged and ground tested at this point.
The lower limit should be set and the drum turned until it rests at the lower limit
position to aid in installation .
Reference the Winch documentation located within the winch box.