Instructions / Assembly

REMOVE PROTECTIVE FILM
8
If applicable, remove any protective lm immediately
from all surfaces of the frame/sash and within six
months from any glass.
After Installation
Ensure weep holes/channels are clear of debris for proper water
drainage. Do not seal weep holes/channels.
Leave an expansion/contraction gap of approximately 3/8" between the
window frame and nal exterior wall surface (siding, stucco, etc.).
Protect recently installed units from damage from plaster, paint, etc.
DO NOT operate the casement sash in the extended
position for long periods of time or leave unattended
in the fully open position, as potential damage may
occur from environmental factors (i.e., unexpected
strong wind gusts).
Installation Instructions
for Vinyl Windows with Integral Nailing Fin (JII001)
Please visit jeld-wen.com for warranty
and care and maintenance information.
Thank you for choosing
JII001 12/23
©2023 JELD-WEN, Inc. This publication and its contents are owned by or licensed to JELD-WEN, Inc. or its afliates or third parties, and are protected by copyright, trademark, and other laws. Unauthorized use
or duplication is prohibited. JELD-WEN reserves the right to change product specications without notice. Please visit our website at jeld-wen.com for current information.
All rights reserved.