Operator Manual

SECTION 4 - MACHINE OPERATION
4-16 – JLG Lift – 3121255
4.14 STOWING THE JIB FOR TRANSPORT
(1100SJP ONLY)
1. Place the boom in the stowed position with the axles
retracted.
2. Hold the Jib Swing control switch to the right until the
platform will no longer swing.
NOTE: The Jib Swing function is not operable when the Capacity
Select control is in the 1000 lb. (450 kg) position.
NOTE: Automatic platform leveling is disabled when stowing the
jib.
3. Push and hold the Jib Stow override control switch and
jib swing switch until the jib and platform are in the
stowed position under the boom.
4. Rotate the platform completely to the right.