Exposedendsofcabinets(typicallyattheendofcabinetruns)will
requireacoverpanel.Placecoverpanelontocabinet,liningupto
beushtothetopofthecabinetbox,andushtothecabinetdoor
ordrawerfrontandsecurewithclamp.Fastenwith1-1/4"(included)
screwsthroughthepre-drilledshelfholesofthecabinetintothe
coverpanel.Note: Cover panels will be longer than wall cabinets.
In some applications, you may need to trim panel down. Some
cover panels are required in-between cabinets during the cabinet
installation process. All cover panels are called out on your oor plan
and elevation view printouts. For best results, lay painters tape on the
nished side of the panel before cutting.
6)
Thenextcabinetwillbesetintoplaceandclampedtothepreviously
installedcabinet.Clampthetwocabinetboxestogethersothat
thefront,topandbottomfacesareush.Verifythatthecabinetis
levelandinstall4cabinetscrewsthroughthefasteningstripsinto
thewallstuds.Withcabinetsstillclampedandush,installcabinet
connectorsthroughthepre-drilledshelfholesofthecabinets.
CABINET CONNECTOR INSTALLATION (478-3872)
Before you begin installing cabinet connectors,
it is important to note the holes that are used in
building your cabinet congurations. We have found
it common to use the fourth hole from the top and
bottom for cabinet connector installation, however,
some congurations require use of these holes. Use
the installation instructions included with drawer kits
and hinges to determine hole locations.
Oncecabinetconnectorinstallationlocationshavebeendetermined,
usea3/16"or5mmdrillbittodrillthroughdesiredhole.Insert
cabinetconnectorandfastenusingaPhillipsheadscrewdriver
untiltight.Wesuggestusingtwocabinetconnectorsatthefrontof
thecabinetandonenearthebackifneeded.Onceconnectorsare
installed,removeclamps.Continueinstallingwallcabinetsinthis
fashion until all are installed.
Startingwiththecornerwallcabinet,install4cabinetscrewsthrough
thefasteningstripsonthecabinetintothewallstuds.Besureto
checkforlevelbeforefasteningcabinetintoplace.
4)
5)
Ifyoudonothaveacorner,startwiththeend
closesttoawall.Cabinetsagainstwallwillrequire
allerstriptobegin.Installllerontocabinetbefore
installingcabinettowall.