Installation Guide

1. Prepare the Site
NOTICE: Measure your actual product for site preparation. Visit the product page at www.kohler.com for
additional information.
Flooring
NOTICE: Provide adequate floor support.
Install adequate floor support.
NOTICE: To ensure a successful installation, it is important that the bath be installed on a level subfloor.
Verify the subfloor is level. Adjust for level, if necessary.
Framing
CAUTION: Risk of property damage. Do not support the bath by the rim. The bath must be
supported by the support blocks only.
NOTICE: Use wood or concrete framing. Wood framing will provide the best vibracoustic quality.
NOTICE: If installing the control amplifier between studs, stud spacing should be 16 (406 mm).
NOTE: The framing illustrated is less finished wall material. Allow for wall material thicknesses when
framing. When planning the construction of the framing, take into account the thickness of the finished
wall and access panel materials.
NOTICE: This bath must be installed as an alcove installation.
Construct the framing.
IMPORTANT! The cables that will connect the control amplifier to the bath transducers, chromatherapy
lights (if equipped), and the user interface are each 25’ (7.6 m) in length. Carefully plan out and position
the control amplifier so these routed cables will easily reach without placing tension on the cables.
Choose the preferred location for the control amplifier, then construct the stud framing or pocket.
Plumbing