Installation Guide

6. Remove the Blower Motor and Check Valve - Remote
NOTICE: This section applies only to installations in which the blower motor and check valve are
being relocated from the shipping position on the support board.
NOTICE: Do not cut the blower harness for this installation.
NOTICE: You must relocate the check valve with the blower motor.
Remove the Blower Motor
Disconnect the blower motor electrical plug from the control.
Remove any cable ties that support the blower motor cord.
Remove and retain the retaining screw holding the blower harness on the blower motor discharge.
Remove and retain the four motor mounting screws from the blower adapter baseboard.
While restraining the tee with one hand, slide the blower motor away from the tee.
Remove the blower motor from the bath.
Remove the Check Valve
Remove and retain the upper retaining screw at the check valve.
Remove the check valve and attached PVC elbow from the bath.
Prepare the Site
NOTE: Refer to the Before You Begin section for detailed requirements for the blower motor relocation.
Prepare the site where the blower motor will be installed. The site must be within 15’ (4.5 m) of the
bath.
As appropriate, install an access panel to service the blower motor.
As appropriate to the installation, prepare the routing paths for the PVC piping and the new blower
motor power cable. Follow all applicable codes.
Elbow
Screw
Baseboard
Control
To Blower Motor
Cover
Junction
Box
Blower Motor
Mounting Screws
Blower Motor
Electrical Plug
Check
Valve
1035472-2-K 10 Kohler Co.