Installation Guide

2. Prepare the Site
NOTICE: Do not attempt to remove the hardened casting material covering the wooden support blocks.
The casting material is required to properly position and install the bath.
IMPORTANT! To ensure a successful installation, install the bath on a level, finished floor.
IMPORTANT! Make sure the subfloor offers adequate support for the bath.
Temporarily position the bath and shroud in the installation location.
If applicable, remove and discard the thin plastic film covering the support blocks.
Verify that the bath is level. Shim under the bath if necessary, and secure the shims to the bath.
Without moving the shroud, lift and remove the bath from the shroud.
Use the drain area cut-out in the shroud to trace the drain-hole area on the floor.
Remove the shroud and set it aside.
Refer to the specification sheet on the bath product page at kohler.com to determine any drain
clearance requirements, and cut adequate floor clearance as needed.
Refer to the specification sheet on the bath product page at kohler.com for drain height details.
Position and install a standard PVC or brass bath drain pipe to the correct height.
Shroud
Finished
Floor
Trace the
drain-hole area.
Support Block
1237787-2-G 4 Kohler Co.