Installation Guide

Roughing-In K-18691
IMPORTANT! Off-set the hot and cold supply stops according to
the roughing-in information. This will ensure the handles will not
touch the pedestal when fully open.
Install the water supplies and drain pipes according to the
roughing-in information.
Install sufficient backing behind the finished wall to provide a
secure material for the anchoring devices.
Mark the centerline on the floor with a pencil.
Position the pedestal on the floor centerline location and flush
against the finished wall. Refer to the roughing-in information for
the required distance.
2-1/4" (5.7 cm)
10"
(25.4 cm)
20-1/4"
(51.4 cm)
Finished Wall
Slotted
Anchor Holes
2-1/4" (5.7 cm)
4-1/16"
(10.3 cm)
31-3/4"
(80.6 cm)
1-1/4 OD
3/8"
Cold
11" (28 cm)
39-3/4" (101 cm)
22-1/16" (56 cm)
14-3/16"
(36 cm)
1-1/4"
(3.2 cm)
9-1/2"
(24.1 cm)
11"
(27.9 cm)
28-7/8"
(73.3 cm)
3/8"
Hot
2-1/4"
(5.7 cm)
Kohler Co. 7 1052866-2-E