Installation Guide

Installation
Step 9 Tile Layer
Spread tile spacers over the weep holes of the drain. This will prevent mortar
from plugging the holes.
Using mortar, build the shower base up approximately half way between the
shower base and the marked perimeter.
Cover the mortar bed with metal lath, keeping the metal lath 1/2 (1.3 cm) away
from the strainer body.
Using mortar, build up the shower base up to the marked perimeter. Slope the
mortar lower around the strainer ring to allow space for the thickness for the tile.
Allow the mortar to cure overnight before installing the tiles.
Using a thinset mortar, install the floor tile and the entire shower alcove.
Grout, clean, and seal all tile in the shower area.
Installation
Étape 9 Couche carrelage
Étaler les espaceurs de carrelage sur les barbacanes du drain. Ceci évitera que le
mortier ne bouchent les orifices.
Avec du mortier, construire la base à approximativement mi-chemin entre la base
de douche et le périmètre marqué.
Couvrir le lit de mortier avec une latte métallique, en gardant cette dernière à
1/2 (1,3 cm) du corps de la crépine.
Plate
Plaque
Placa
1-1/2"
(3.8 cm)
Step 9/Étape 9/Paso 9
Lath/Grille/Malla
Mortar Cement
Mortier
Cemento mortero
Mortar Thinset
Mortier
Mortero para azulejo
Tile
Carrelage
Azule
jo
1090854-2-B 16 Kohler Co.