Installation Guide

1. Round Handle Installation
Turn the transfer valve to the bath fill position (fully clockwise for
a two-way valve; center position for the three-way configuration).
Apply a bead of plumbers putty or other sealant around the
escutcheon flange according to the putty manufacturer’s
instructions.
Position the escutcheon loosely on the valve so that the three dots
will be clearly visible after installation. The center dot should
indicate the bath fill position.
Temporarily position the knob on the valve to confirm proper
alignment of the dots.
Remove the knob and press the escutcheon firmly into place.
Remove any excess putty.
Install the trim rings to the knob grooves, using care to avoid
stretching.
Secure the knob to the valve with the screw.
Install the O-ring in the remaining groove on the knob.
Snap the cap onto the knob.
Align three dots (center dot
should indicate bath fill).
Valve
Pin
Knob
Grooves
Trim Rings
O-Rings
Screw
Cap
Confirm dot alignment.
Escutcheon
Kohler Co. 3 086840-2-AB