Installation Guide

Step 4: Connect waterlines to faucet and main valve
Step 5: Flush faucet
Secure hot & cold waterlines (G) to
hot and cold valves (A & B) (Hand-
Tighten Only). Thread other end
of waterlines to T-union (F). Attach
3/8 in. OD x 1/2 in. IPS waterlines
(H) to copper pipe on valves
A. Hot Side: Left
B. Cold Side: Right
Secure other end of waterlines to
angle stops. Tighten all ends with
adjustable wrench until snug. Turn
on angle stops and check for leaks
(DO NOT TURN FAUCET ON)
Remove adjustable aerator (I) with
aerator key (J). Turn water on for
1 minute to remove any debris.
Reassemble adjustable aerator (I)
1
2
3
1 1/4-18UNF-2A
9/16”-18UNEF
27mm ~ 41.3mm
1 1/16” ~ 1 5/8”
7A
8B
8C
8D
8A
9/16”-18UNEF
27mm ~ 41.3mm
1 1/16” ~ 1 5/8”
7A
8B
8C
8D
8A
7A
8B
8C
8D
8A
4 5
H
A
D
D
A
C1
C2
C3
B
E1
E2
F
B
C
C
F
E
H
A
B
H
G
G
I
J
F
1
2
3
1 1/4-18UNF-2A
9/16”-18UNEF
27mm ~ 41.3mm
1 1/16” ~ 1 5/8”
7A
8B
8C
8D
8A
9/16”-18UNEF
27mm ~ 41.3mm
1 1/16” ~ 1 5/8”
7A
8B
8C
8D
8A
7A
8B
8C
8D
8A
4 5
H
A
D
D
A
C1
C2
C3
B
E1
E2
F
B
C
C
F
E
H
A
B
H
G
G
I
J
F