Manual

HOT SURFACE IGNITION OPERATION SEQUENCE:
A call for heat occurs from the building’s environment
control.
1-15 VDC is sent from the SmartBox
variable rate
heat controller to the variable rate solenoid on gas
control valve.
Line voltage is sent to transformer and to ignition
control.
24 V.A.C. is sent from transformer to the ignition
control.
Red light on ignition control is illuminated
Ignition control module performs an internal safe start
check
-- Internal components are tested
-- Amperage is sent to flame sensor from ignition
control to start flame proving process.
-- Ignition control terminal PSI sends 24 volts to air
proving switch.
Ignition control module begins safety lockout timing
Ignition control module sends 115 volts from terminal
IND to the fan motor.
-- Fan motor starts
-- Air proving switch closes and 24 volts is returned
to ignition control terminal PSO.
Fan motor stops.
Ignition control 115 volts from terminal HSI to the
igniter.
-- Ignitior heats up in 17 seconds.
Ignition control restarts the fan motor.
Air proving circuit is rechecked.
Ignition control sends 24 volts from terminal MV to the
gas control valve through the high limit switch.
Ignition occurs.
-- Ignitor stays powered for 6 seconds until flame
proving occurs.
Ignition control shuts the ignitor down.
-- Gas valve stays open
Room warms to desired temperature
-- Room sensor is satisfied
-- Heater shuts down
Process begins again on call for heat
MULTIPLE IGNITION TRIAL SEQUENCE:
First trial for ignition takes approximately 45 seconds
Two more trials for ignition will occur
-- Second trial follows immediately if first trial fails
-- Module starts a 15 minute wait period to allow
ignition Interruption to pass
-- Third and final trial occurs after 15 minute wait
period
If ignition control module does not prove flame after
third trial, the module goes into safety lockout (3 Flash
Pattern)
-- Igniter shuts down
-- Fan motor stops
-- Gas valve closes
Ignition control must be reset
-- Unplug the heater and plug it back in
-- OR --
-- Turn building controller off and then back on to call
for heat
20