Instruction Manual

Section 6: Maintenance &Troubleshooting Spirit II User’s Manual
This information is subject to the controls of the Export Administration Regulations [EAR]. This information shall not be provided to
non-U.S. persons or transferred by any means to any location outside the United States contrary to the requirements of the EAR.
6-6
Microprocessor (DSP) Sequence of Operation
The following DSP Indicators should illuminate after primary power is applied:
D77 3.3V Supply
D78 1.8V Supply
D50 ISC (Door)
D33 Coolant Level
D37 Arc Hold (if INOVA is being used)
D10 RS232 T1 Out (Blinking)
D11 CAN RXD (Dim Flashing)
D12 CAN TXD (Dim Flashing)
The following DSP Indicators should illuminate when the OFF Button is released:
D40 OFF Button
The following DSP Indicators should illuminate when the ON Button is activated:
U21 Opto Motor / Solenoid
U19 Opto Solenoid (not used)
U26 Opto Fan
D42 Plasma Ready
The following DSP Indicators should illuminate when a START signal is applied (begin
cut cycle):
D36 Start
U27 Opto Preflow
U29 Opto Shield
U24 Opto Surge (only over 100 amps)
U23 Opto Contactor
D24 PWM (Chopper ON)
U22 Opto Pilot Arc Relay ON
D43 PAT ON (Blinks during a START)
U34 Opto ISC (Blinks during a START)
The following DSP Indicators should illuminate with an arc transfer:
U31 Opto Postflow
U28 Opto Plasma
D41 Motion
The following LEDs should turn OFF after the Motion Indicator turns ON:
U34 Opto ISC
U27 Opto Preflow
D43 PAT
When the START signal is removed, OPTO U30 (Vent) will illuminate. It will then go out
with the rest of the cut cycle indicators.