User Manual

Parts List
5
Remember to use gloves during assembly to avoid pinching.
At least 2 people are required to assemble the trampoline.
Please refer to this page for parts descriptions and letters. The assembly steps use these descriptions and letters as reference for your convenience.
Make sure that you have all parts listed.
ASSEMBLY INSTRUCTIONS
STEP 1 - Support Assembly
6
Tools required
Adult assembly required
Insert a vertical leg extension (F) through hole on each end of a
plastic horizontal leg base (C). Repeat for remaining 2 plastic
horizontal leg bases (C).
Insert a plastic vertical leg extension (D) over each vertical
leg extension (F). Repeat for remaining 5 vertical leg
extensions (F).
Layout 3 sets Support Assemblies (pre-assembled in STEP 1) as shown above.
STEP 2 - Frame Layout
Insert the corner top rail with
socket (E) to the Support Assembly
as shown. Repeat this for all corner
top rails with sockets (E).
IMPORTANT: hole in corner top
rail should align to the hole in
vertical leg extension.
IMPORTANT: be sure the curve side of the plastic
horizontal leg bases (C) and the curve of the top
rails (G) are facing outward.
There are total of 12 pieces of tubing and 3 sets Support Assemblies (pre-assembled in STEP 1) that
are needed to assemble the frame.
Assemble top rail (G) into each end of corner top rail with socket (E). To connect parts,
simply slide the section of tubing that is smaller on one end into the adjacent section that
has a larger opening as shown.
Holes must face up.
Recess on plastic vertical leg extension (D) must t into
leg base (C) as shown.
Qty - 1
Trampoline Mat stitched with
Triangle-rings and safety pad
Qty - 1
Enclosure Netting
Qty - 3
Plastic Horizontal Leg Base
Qty - 6
Plastic Vertical Leg Extension
Qty - 6
Vertical Leg Extension
(with “Button Cap”)
Qty - 6
Corner Top Rail with Socket
Qty - 6
Top Rail
Qty - 3
Horizontal Tube
Qty - 36
Galvanized Springs
Qty - 6
Bolt
Qty - 6
Self-locking screw
Qty - 6
Cap Nut
Qty - 12
Arc Washer
Qty - 6
Spring Washer
Qty - 1
Wrench
Qty - 1
Spring Loading Tool
with Allen wrench
and screwdriver
Qty - 3
Foam Tube for
Horizontal Tube
Qty - 6
Foam Tube for
Straight Frame Tube
Qty - 6
Foam Tube for
Curved Frame Tube
Qty - 6
Straight Frame Tube
Qty - 6
Curved Frame Tube
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
Qty - 1
Shoe Bag
Qty - 1
Screwdriver
V
S
T
U
W
Safety glasses should be worn during the assembly of trampoline.
(not included)