Install Instructions

54
Installation & Service Manual
8 Maintenance and annual startup
Table 8A_Service and Maintenance Schedules
Service technician
(see the following pages for instructions)
General:
• Address reported problems.
Inspect interior; clean and vacuum,
if necessary;
Check for leaks (water, gas, flue)
• Examine venting system
Check system water pressure/
system piping/expansion tank
Check control settings
Check wiring and connections
Flame inspection (stable, uniform)
Check flue gas passageways
Inspect and clean the burner
Perform start-up check out and
performance verification per Section
6 - Start-up
If combustion or performance
indicate need:
Clean heat exchanger
Remove and wash burner
Annual Startup
Owner maintenance
(see the User’s Information Manual for
instructions)
Daily
Check appliance area
• Check pressure/temperature
gauge
Monthly
Check vent piping
Check relief valve
Periodically
Test low water cutoff (if used)
Reset button (low water cutoff)
Every
6 months
Check appliance piping (gas
and water) for leaks
Operate relief valve
End
of season
months
Shut appliance down (unless
boiler used for domestic hot
water)