Install Instructions

9
1 Determine boiler location (continued)
ALCOVE INSTALLATION
OPEN
FRONT
1/4" (6 MM) MINIMUM CLEARANCE
AROUND HOT WATER PIPES
1” (25 MM) MINIMUM CLEARANCE
AROUND VENT PIPE
18" (457 MM)
FRONT
0"
RIGHT
13" (330)
TOP
12"
(305 MM)
LEFT
14" (356 MM)
REAR
RECOMMENDED SERVICE CLEARANCES:
FRONT - 30” (762 mm)
TOP - 24” (610 mm)
LEFT SIDE - 24” (610 mm)
REAR - 24” (610 mm)
Figure 1-2 Alcove Installation - Minimum Required Clearances
CLOSET INSTALLATION
CLOSED DOOR
VENTILATING
AIR OPENING
*
*
*
ARE
A
OF
EACH O
P
ENING:
1 SQ. INCH PER 1000 BTU PER HOUR INPUT
WITH A MINIMUM OF 100 SQ. INCHES.
1/4" (6 MM) MINIMUM CLEARANCE
A
ROUND HOT WATER PIPES
1” (25 MM) MINIMUM CLEARANCE
A
ROUND VENT PIPE
6" (152 MM)
FRONT
6"
13"
TOP
0"
RIGHT
12"
(305 MM)
LEFT
14" (356 MM)
REAR
VENTILATING
AIR OPENING
RECOMMENDED SERVICE CLEARANCES:
FRONT - 30” (762 mm)
TOP - 24” (610 mm)
LEFT SIDE - 24” (610 mm)
REAR - 24” (610 mm)
Figure 1-1 Closet Installation - Minimum Required Clearances
WARNING
WARNING
Installation & Operation Manual
For alcove installations, CPVC,
polypropylene or stainless steel
vent material MUST BE used in
an alcove structure due to elevated
temperatures. Failure to follow
this warning could result in fi re,
personal injury, or death.
For closet installations, CPVC,
polypropylene or stainless steel
vent material MUST BE used in
a closet structure due to elevated
temperatures. Failure to follow
this warning could result in fi re,
personal injury, or death.