Installation Manual

Page 26
© 2015 Sensata Technologies
Installation
240
VAC only
in standby
Main Panel
(Utility Power/Generator Input)
ME Series Inverter
AC Terminal Block
(AC input and output wiring)
DUAL IN / DUAL OUT wiring
AC HOT 1 IN
(from Main Panel)
AC HOT 1 OUT
(to Sub-Panel)
AC NEUT IN
(from Main Panel)
AC NEUT OUT
(to Sub-Panel)
AC HOT 2 IN
(from Main Panel)
AC HOT 2 OUT
(to Sub-Panel)
Sub-Panel and Outlets
(
Inverter Loads
)
120
VAC
120
VAC
AC GROUNDS
(to/from
both panels)
ON
OFF
ON
OF F
ON
OF F
ON
OF F
ON
OF F
ON
OF F
ON
OF F
ON
OF F
ON
OF F
ON
OF F
ON
OF F
ON
OF F
ON
OF F
30
Maximum
30-amp breaker
(double pole)
required to
inverter AC input
30
In mobile installations: neutral is typically not
connected to ground in the main panel.
ON
OF F
ON
OF F
ON
OF F
ON
OF F
ON
OFF
Figure 2-14, AC Wiring for Dual In – Dual Out Con gurations