Installation Manual

© 2010 Magnum Energy, Inc.
2. The AC input voltage falls < 85 VAC – the charger reduces the charge
current to zero to help stabilize the incoming AC voltage; or
3. FET Temperature.
The automatic 4-stage charging process includes:
Bulk Charging: This is the initial stage of charging. While bulk
charging, the charger supplies the battery with constant current.
The charger remains in bulk charge until the absorption charge
voltage is achieved (14.6 VDC/12 volt models or 29.2 VDC/24 volt
models)* – as determined by the Battery Type selection**.
Absorb Charging: This is the second charging stage and begins
after the bulk voltage has been reached. Absorb charging pro-
vides the batteries with a constant voltage and reduces the DC
charging current in order to maintain the absorb voltage setting.
The absorb charging time is 120 minutes – as determined by the
Battery AmpHrs selection**.
Float Charging: The third charging stage occurs at the end of the
absorb charging time. While oat charging (also known as a main-
tenance charge), the batteries are kept fully charged and ready if
needed by the inverter. The Float Charging stage reduces battery
gassing, minimizes watering requirements (for ooded batteries),
and ensures the batteries are maintained at optimum capacity.
In this stage, the charge voltage is reduced to the oat charge
voltage (13.4 VDC/12 volt models or 26.8 VDC/24 volt models)*
— as determined by the Battery Type selection** — which can
maintain the batteries inde nitely.
Full Charge (Battery Saver™ mode): The fourth stage occurs
after four hours of oat charging. The Full Charge stage maintains
the batteries without overcharging, preventing excessive loss of
water in ooded batteries or drying out of GEL/AGM batteries. In
this stage, the charger is turned off and begins monitoring the
battery voltage. If the battery voltage drops low (12.7 VDC/12
volt models or 25.4 VDC/24 volt models), the charger will auto-
matically initiate another four hours in oat charge.
* These voltage settings are based on the Battery Temperature Sensor
(BTS) being disconnected, or at a temperature of 77° F (25° C). If the BTS
is installed, these voltage settings will increase if the temperature around
the BTS is below 77° F (25° C), and decrease if the temperature around the
BTS is higher than 77° F (25° C).
** The MM-AE Series uses changeable settings (see Table 6, Inverter Default
Settings) that are adequate for most installations. However, if you determine
that some of your operating parameters need to be changed, the ME-RC50
remote control can be purchased to allow changes to those settings.
25
3.0 Operation