User Guide

86. Re-connect the Purge solenoid electrical con-
nection, then install the right angle tting of the long
EVAP hose to the top connection of the Purge sole-
noid. Connect the squeeze tting of the shorter EVAP
hose to the lower connection of the solenoid.
87.
Connect the remaining end of the short EVAP
hose to the tting on the passenger (left) side of the
inlet manifold above the supercharger drive shaft.
88. Locate the Vacuum accesory line at the re wall
and install the length of 1/8 hose supplied onto the end
of the check valve.
Vacuum accessory line
and Check valve
1/8” hose
85. Connect the long EVAP hose with the Test port
tting to the re wall connection. Route the other end
of the hose forward between the driver side coil pack
and the fuel rail. Pass the hose under the inlet maifold
and supercharger drive to the EVAP purge solenoid.
12/05
Page 24
2005-2006 Pontiac GTO LS2 Supercharger Installation Instructions magnacharger.com