User Guide

130. Connect the Black ground (-) wire with the ring
terminal to the chassis ground connection located just
below the Cruise Control module platform. Remove
the nut with a 10mm wrench and place the ring ter-
minal on the stud. Re-install the nut and tighten it
securely.
129. Install the fuse and Fuse-tap back into its original
location. On the end of the yellow wire from the relay
harness, strip the insulation back 1/4” and crimp on
the female spade terminal. Connect the female spade
terminal to the male spade of the Fuse-Tap.
Chassis
ground
131. Connect the Red positive (+) wire with the ring
terminal to the main power connection on the side of
the Fuse/Relay Center. Remove the nut with a 10mm
wrench and place the ring terminal on the stud by
passing the red wire up from under the base and on to
the stud. Re-install the nut and tighten it securely.
132. Lay the coolant pump relay next to the row of
fuse on the Fuse/Relay center base. Install the Fuse/
Relay center cover on the base by raising the relay
slightly to hook the rear edge of the cover on the base
then snap the cover in place.
12/05
Page 35
2005-2006 Pontiac GTO LS2 Supercharger Installation Instructions magnacharger.com