Use and Care Manual

1. Before beginning any work on the electrical installation, be sure that the main
breaker panel switch is OFF to avoid any danger of electric shock. All mounting and
plumbing MUST BE completed before proceeding with the electrical installation.
2. AII electrical work must comply with national and applicable state and local
electrical codes.
3. AII units must be connected to a properly grounded, dedicated branch circuit of
proper voltage rating.
4. ECO18O: Requires two dedicated double pole circuit breakers (2x5Oamp). Use two
insulated supply cables per double pole breaker and a ground wire to connect to
"ground bar". ECO27O: Require three dedicated double pole circuit breakers
(3x5Oamp for EC027O). Use two insulated wires for each of the three separate
double-pole breakers and a ground wire connected to the "ground bar"
Please use a backup wrench when installing water ttings. Connections are 3/4" NPT
Important notes about electrical connections:
15
Fig.13
Outlet
Rubber Washers
Inlet
Backup Wrench