Installation

31
Performance Checklist
—Verify cabinet size.
Verify electrical supply and water supply (if applicable).
Install anti-tip device(s) and verify unit is secure.
Position unit in cutout, level at desired height and secure unit.
—Plug-in unit and verify operation.
—Connect water supply (if applicable).
Verify icemaker fi ll tube is properly inserted.
Verify icemaker bail arm is down.
—Align/square door(s).
Verify drain pan is properly installed and there are no leaks on water connection.
—Install kickplate.
Remove internal packaging and labels and wipe unit down.
Installer’s information:
Installer’s name: _________________________________________________________________
Installer’s company: ______________________________________________________________
Date: __________________________________________________________________________