How to Guide

STEP 1A - CONCRETE CEILING
SWITCH OFF THE ELECTRICAL MAINS AT THE
CIRCUIT BREAKER FUSE BOX.
IMPORTANT : SCREWS & NUTS MUST BE
TIGHTENED TILL SNUG
STEP 1B - WOODEN CEILING
SWITCH OFF THE ELECTRICAL MAINS AT THE
CIRCUIT BREAKER FUSE BOX.
IMPORTANT : SCREWS MUST BE TIGHTENED
TILL SNUG
3
Flat Washers (3)
Expansion Bolts (2)
Nuts (5)
Mounting
Bracket (1)
Spring Washers (4)
Washers (3)
Self Tapping
Screw (2)
Mounting
Bracket (1)
1) Use the Mounting Bracket (1) as a guide,
mark the spots where the 4 Self Tapping
Screws (2) will be drilled.
2) Remove the Mounting Bracket (1), drill 4
holes for 3MM diameter, install the mounting
bracket onto wooden ceiling with the 4 Self
Tapping Screws (2) & Washers (3).
1) Use the Mounting Bracket (1) as a guide,
mark the spots where the 4 Expansion Bolts (2)
will be drilled.
2) Remove the Mounting Bracket (1), drill 4
holes and insert 4 Expansion Bolts (2) into the
concrete ceiling, install the mounting bracket
and secure with Flat Washers (3), Spring
Washers (4) and Nuts (5).
INSTALLATION INSTRUCTION