Specifications

1.
2.
PROCEDURE
WITH COMPRESSOR
OPERATIVT
Fill
charging cylinder
with
at
least 6 ounces more refrigerant than needed for final
charge
of system.
Plug in
charging
cylinder heater to raise
pressure
to
30
lbs.
above
ambient
cylinder
pressure.
NOTE:
Maintain but do
not
exceed
this 30
pounds
above ambient
pressure
until system
is charged.
Braze
permanent
access
valve on compressor discharge
line at least 4 inches from
compressor
body
(Steps
1,2
& 3).
STEP
1
STEP 2
BRAZE
ON
TUBE
FORM
SADDLE
WITH
TUBE
Leak check
permanent
access valve
with
refrigerant
gas
from top valve
of charging
cylinder connected through
charging hose and hand valve to
access
valve
(Step
4).
Pierce
discharge tubing with access valve, make
certain valve core is installed to
pre-
vent
premature
discharge
of
refrigerant
(Steps
5 & 6).
STEP
4
CHECK
STEP 5
S
3.
4.
FOR
LEAKS
AT
BRAZE
PLACE
SEAL
ONTO STEEL
PIN
6
INSERT
STEEL
PIN INTO
BODY
SCREW CAP ON
BODY TO PIERCE
TUBE.
USE TWO
WRENCHES
TO AVOID
VALVE
FROM
TWISTING
TEP
ml
sl
coor
DOWN
WITH
SEAL
CHECK
VALVE CORE
TO MAKE
SURE
IT
IS TIGHT
STEP
3
ABRASIVE
CLOTH
3-16
WET
CLOTH