Specifications

22.
lnstall
hand valve on access
valve and
charge
to factory
specified
charge.
23.
Close
hand
valve and
quickly
remove
it from access valve.
Close
lower valve on
charging
cylinder,
using
hand
valve, slowly
release refrigerant contained
in charging
hose.
24.
Put
Teflon
tape on access
valve
threads and
install cap on access
valve.
(Use
two
wrenches
-
one on
valve body,
the other
on cap.)
25. Wait
approximately
5
minutes
for
pressure
to
equalize,
then
turn compressor
on and
check
for
refrigerant.
f-
3-20