Specifications

19. Position
the coil
and install
the
mounting
screws.
20. Transfer
the radiant heaters
to
the
replacement
coil.
When installing
the
radiant
heaters,
do not touch
the
heater
glass.
Fingerprints
not
wiped
off
could
cause the
glass
to crack
at
heater
operati ng tem
peratu
re.
21. Connect
the electrical
components
that
you
disconnected
in
Step 10.
22.
Caretully
bend the lower
portion
of the
heat
exchanger
into the
machine
compartment
and
resolder
the
suction
line
to the
compressor.
Remember
to
shape the
tubing
so
it
won't
rub
against
the
cabinet
or other wiring.
23. lnstall
a new
drier
as
instructed
under
"Replacing
Drier".
Then leak
test
all
joints.
24. Evacuate
and
recharge
the system
as
instructed
under
"Evacuating
and
Rechargi
ng
".
25.
Test run
the
unit to make
sure it
is
operating
properly.
26. Pinch
off the
process
tube
and cut
off
the
service
valve.
Solder
the
joint
and
test for
leaks.
27.
Reseal
the
heat
exchanger
entrance
hole
with
butyl
sealer, making
sure
you
have
a
good
seal.
28. Reinstall
the
tubing
clamp
on the heat
exchanger.
29. Reinstall
the machine
compartment
cover
exactly
as
it
was
before removal
to
maintain
proper
air flow across
the
compressor
and defrost
pan.
30. Reinstall
the
freezer
parts
in reverse
order
of their removal
in
Step
9.
4-14