Installation Instruction

— 7 —
W10337809C
6. Insert the sub-assembly from Step #5 into the left side knock-
out hole, rib-end facing out. Slide a clamp onto the elbow and
attached elbow end to the 187 mm (7.40”) vent tube already
in the dryer. See Figure 29.
7. From the outside of the dryer, install the vent ring included
with kit by sliding over exhaust vent tube and snap into place.
See Figure 30.
5. Attach the 305 mm (12.0”) long vent tube and elbow from kit
together using clamp included in kit. Tighten clamp to hold
sub assembly together. See Figure 29.
(continued)
figure 30



Section 3 - Right Side Exhaust Venting
NOTE: Allow for a min. clearance of 10” from wall to dryer side
panel if venting exhaust downward after existing side panel of
dryer.
1. As you are facing the dryer, review the lower section of
the right side panel. If two (2) knockout features are pres-
ent remove the MOST REARWARD KNOCKOUT ONLY.
See Figure 31.
2. To remove the rearward right side knockout by using either
a 1/8” drill bit and drill or a cold chisel and hammer. Re-
move the six (6) knockout retaining tabs around the edge.
See Figure 32.
figure 32


3. Using a cold chisel and hammer around the knockout hole
edge, work around the edge until the knockout is removed.
Use a file to remove the small edge burrs generated by the
knockout procedure.
4. Attach the 187 mm (7.40”) long vent to the blower housing
using the 3/8” long screw removed in step 20 of “Procedure
for Dryer Disassembly” section.










figure 29
8. Assure the positioning of the exhaust vent assembly, making
sure the positive stop bump on the 305 mm (12.0”) long vent
tube is on the outside of the dryer. See Figure 30. Securely
tighten both clamps. See Figure 29.
9. Left side venting of your dryer is now complete. Reassemble
dryer in reverse order as the dryer was disassembled refer-
encing this instruction sheet assuring proper assembly and
wire lead connections.
10. Proceed to “Completing Dryer Installationsection at the end
of this instruction sheet.
figure 31


